Search

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

HomeManufacturersSTANDARD INDUSTRIE INTERNATIONAL
1/3
STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

Powernet

Model

Series

SILO & HOPPER CLEANING SERVICES


Transaction Process

Please contact the manufacturer/supplier.

Payment

Contact the manufacturer/supplier.

Delivery

Contact the manufacturer/supplier.

Shipment

Contact the manufacturer/supplier.

Origin

Contact the manufacturer/supplier.


Description

POWERNET
YOUR ANSWER FOR BRIDGING PROBLEMS

  • Diameter for storage units from the top or bottom:
  • 65 to 300 mm
  • Intervention depth: Up to 45m
  • Controlled from outside
  • All types of storage units
  • All types of materials
  • To be used before GIRONET
  • 2 versions 
    – Pneumatic: for friable products (coal, bran, sugar, ash etc.)
    – Hydraulic: for hard products(slag, cement, sulphate carbonate etc.)

TOTAL SAFETY : No human presence inside the silos and hoppers/Our teams comply with safety standards

SAVINGS : Production continues while intervention/100% storage capacity regained/material loss 

PERFORMANCE : Intervention above or under & on all types of materials/rapid & efficient intervention

ENVIRONMENT : Dry holing (no additives / Pollution free)

  • Visits & recommendations
  • Assembly & cleaning by us
  • Rapid intervention
  • Intervention by our specialised teams
  • Cleaning finalised with GIRONET

DRILLS:

3 types of drills:

– Diameter 65 mm: pre-piercing
– Diameter 150 mm: Piercing
– Diameter 300 mm: Final piercing

CUSTOMER:    One of the leaders in the chemical industry in Germany

PROBLEM:    Bridging in a silo with a capacity of 9000 m3 (20 m high, 6m diameter). Approximately 15% of the material stored was clogged.

PRODUCT:    Sodium carbonate

OBJECTIVE:    To empty the silo in order to recover 100% of the storage capacity.

SOLUTION:    – First step: Use of pneumatic POWERNET to create a chimney with a diameter of 350 mm.
                       – Second step: Intervention by pneumatic GIRONET and efficiently clean the whole of the silo

RESULT:    The customer recovered all of its storage capacity. Production was not stopped and the intervention took place in complete safety and without human intervention inside the storage unit.

 


 

CUSTOMER:    Sugar house in France

PROBLEM:    Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.

PRODUCT:    Sugar

OBJECTIVE:    Complete emptying of the silo

SOLUTION:    – First step: Use of pneumatic POWERNET to evacuate the extractions
                       – Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material

RESULT:    Recovery of all of the storage capacity of the silonit.

Download

Catalog-Standard Industrie International-Powernet

Inquiry

Komachine Inc.
Head Office:
Ace Dongbaek Tower 1-1101, 16-4,
Dongbaekjungang-ro 16beon-gil, Giheung-gu,
Yongin City, Gyeonggido, South Korea 17015
Branch Office:
606, Seoul Stratup Center, 10,
Noryangjin-ro, Dongjak-gu, Seoul, South Korea 06938
CEOCharlie Park
Corporate #535-86-00664

ⓒ2024 Komachine Inc. All rights reserved.