CUSTOMER: Cement works in the United Kingdom
PROBLEM: Accumulation of material on the production facilities and in the walkway casting a risk of breakdowns and industrial accidents.
PRODUCT: Cement, clinker, coal etc.
OBJECTIVE: Eliminate by vacuum extraction the accumulated material on the production facilities
SOLUTION: Diesel UMA with protection against the risk of explosion and connected to several fixed pipes network in the plant
RESULT: Maintenance of the plant in optimal production conditions with fewer shutdowns and less maintenance. The site became clean respecting the safety of the operators and the environment
CUSTOMER: Quarry in Bulgaria
PROBLEM: Leak of material on mill, conveyor and elevator base
PRODUCT: Limestone and carbonate
OBJECTIVE: Reduce the accumulation of materials in order to keep the production facilities operational
SOLUTION: Electric UMA with 40 m of flexible tubes
RESULT: Productivity of the plant greatly improved with significantly less shutdowns.