CUSTOMER: Cement plant in Turkey
PROBLEM: Build ups in the riser ducts leading to production stops.
PRODUCT: Cement mills (future clinker and then cement)
OBJECTIVE: To remove the concretions that disrupt the industrial process and reduce the production capacity.
SOLUTION: Installation of 4 MACSYS Wireless : 2 MACSYS Wireless with 8 heads DN100 + 2 MACSYS Wireless with 5 heads DN100
RESULT: No more kiln shutdown related to the blockage of the riser ducts
CUSTOMER: Household Waste Incineration Plant (HWIP)
PROBLEM: Accumulation on the walls of the afterburner chamber which reduces the energy efficiency of the facility
PRODUCT: RPIFHW (Residues from the Purification of Incineration Fumes from Household Waste)
OBJECTIVE: Preventively eliminate the accumulation of RPIFHW on the walls
SOLUTION: Installation of 2 MACSYS Wireless 6 heads DN150
RESULT: No more disruption of the process. No more accumulation on the walls of the afterburner chamber equipped with MACSYS