Search

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

+33-3-20-28-32-25
기업찾기STANDARD INDUSTRIE INTERNATIONAL
1/3
STANDARD INDUSTRIE INTERNATIONAL

STANDARD INDUSTRIE INTERNATIONAL

Powernet

모델명

시리즈

SILO & HOPPER CLEANING SERVICES


구매 안내

아래는 참고용 정보이므로 세부 조건은 반드시 제조사/판매자에게 문의 바랍니다.

결제 방법

제조사/판매자에게 문의 바랍니다.

납기 정보

제조사/판매자에게 문의 바랍니다.

배송 정보

제조사/판매자에게 문의 바랍니다.

원산지

제조사/판매자에게 문의 바랍니다.


+33-3-20-28-32-25

제품 상세 설명

POWERNET
YOUR ANSWER FOR BRIDGING PROBLEMS

  • Diameter for storage units from the top or bottom:
  • 65 to 300 mm
  • Intervention depth: Up to 45m
  • Controlled from outside
  • All types of storage units
  • All types of materials
  • To be used before GIRONET
  • 2 versions 
    – Pneumatic: for friable products (coal, bran, sugar, ash etc.)
    – Hydraulic: for hard products(slag, cement, sulphate carbonate etc.)

TOTAL SAFETY : No human presence inside the silos and hoppers/Our teams comply with safety standards

SAVINGS : Production continues while intervention/100% storage capacity regained/material loss 

PERFORMANCE : Intervention above or under & on all types of materials/rapid & efficient intervention

ENVIRONMENT : Dry holing (no additives / Pollution free)

  • Visits & recommendations
  • Assembly & cleaning by us
  • Rapid intervention
  • Intervention by our specialised teams
  • Cleaning finalised with GIRONET

DRILLS:

3 types of drills:

– Diameter 65 mm: pre-piercing
– Diameter 150 mm: Piercing
– Diameter 300 mm: Final piercing

CUSTOMER:    One of the leaders in the chemical industry in Germany

PROBLEM:    Bridging in a silo with a capacity of 9000 m3 (20 m high, 6m diameter). Approximately 15% of the material stored was clogged.

PRODUCT:    Sodium carbonate

OBJECTIVE:    To empty the silo in order to recover 100% of the storage capacity.

SOLUTION:    – First step: Use of pneumatic POWERNET to create a chimney with a diameter of 350 mm.
                       – Second step: Intervention by pneumatic GIRONET and efficiently clean the whole of the silo

RESULT:    The customer recovered all of its storage capacity. Production was not stopped and the intervention took place in complete safety and without human intervention inside the storage unit.

 


 

CUSTOMER:    Sugar house in France

PROBLEM:    Clogging by material of the 70 extractions of the silo. Loss of storage capacity: 1000 tonnes of material clogged in a 5000-tonne silo.

PRODUCT:    Sugar

OBJECTIVE:    Complete emptying of the silo

SOLUTION:    – First step: Use of pneumatic POWERNET to evacuate the extractions
                       – Second step: Intervention by 2 pneumatic GIRONETs to evacuate the material

RESULT:    Recovery of all of the storage capacity of the silonit.