product Image
product Image
Electrostatic Precipitator
Model Name
-
Series
Environmental Business Dept
Data
-
Manufacturer information
provider logo
SAMWON E&B

Blower Manufacturer, High Pressure Blower, Thermal Power Station Fan, Marine Boiler Fan, Tunnel Axial Fan & Jet Fan and more

Problem with product info?
Update request
Manufacturer
SAMWON E&B
Product Type
Machine
Brand
-
SKU
22607
Product Name
Electrostatic Precipitator
Model Name
-
Size
-
Weight
-
Product Details

Features of Electrostatic Wet Precipitator

- Simultaneous removal of gas and dust

- Integrated structure of electrostatic precipitator and wet scrudder

- Unique Multi-Star Pint Discharger

- Management cost reduction with solid discharge structure

- Installation space and cost reduction with compact design

- High efficient precipitation : 99.99%

- Continuous washing of precipitator with water film

- Several application areas with selection of various materials

- Diversified design suitable for characteristics of gas




Application Areas

- TEXTILE
- PULP & PAPER
- COKE OVENS in STEEL INDUSTRY
- HOG FUEL BOILER
- GLASS FURNACE
- SO₂ CONTROL
- FLY ASH CONTROL
- POWER PLANT EMISSION
- AMMNOIA REMOVAL
- LIQUID WASTE INCINERATOR
- SOILD WASTE INCINERATOR
- SULFURIC ACID PLANT
- INCINERATION OF SEWAGE SLUDGE
- ROTARY KILN CLENAING
- CEMENT PLANT





Principle and Characteristics of Electrostatic Precifitator






Basic Diagram of Electrostatic Precipitator




Major Achievements

Construction of Electrostatic Wet Precipitator for Waste Liquid Incinerator of LCD P7

■ Construction Period : 12/25/2004 ~ 04/2006
■ Customer : GS Engineering & Construction, Co. Ltd.
■ Installation Site : LG.PHILIPS LCD P7 Site in paju-si, Gyeonggi-do



Construction Overview

■ Volume of Processed Gas : 10,000㎥ / Hr
■ Type of Processed Gas : Exhaustion gas from rear side of waste liquid incinerator for LCD process
■ Quantity : 1 set
■ Design, Fabrication, Installation and Commissioning





Construction of Electrostatic Wet Precipitator for Hydrogen Fluoride (HF) of LCD P1

■ Construction Period : 03/2001 ~ 11/2001
■ Customer : GS Engineering & Construction, Co. Ltd.
■ Installation Site : LG.PHILIPS LC P1 site In Gumi-si, Gyeongbuk



Construction Overview

■ Volume of Processed Gas : 7,920㎥ / Hr
■ Type of Processed Gas : Exhaustion gas from rear side of LCD Etching for LCD process
■ Quantity : 1 set
■ Design, Fabrication, Installation and Commissiong




 

SAMWON E&B
SAMWON E&B
Blower Manufacturer, High Pressure Blower, Thermal Power Station Fan, Marine Boiler Fan, Tunnel Axial Fan & Jet Fan and more
Inquiry