Search

YESUNG ENGINEERING

YESUNG ENGINEERING

YESUNG ENGINEERING

YESUNG ENGINEERING

HomeManufacturersYESUNG ENGINEERING
1/1
YESUNG ENGINEERING

YESUNG ENGINEERING

하이브리드 에너지 저장 시스템

Model

Series

Products


Transaction Process

Please contact the manufacturer/supplier.

Payment

Contact the manufacturer/supplier.

Delivery

Contact the manufacturer/supplier.

Shipment

Contact the manufacturer/supplier.

Origin

Contact the manufacturer/supplier.


Description

(주)예성엔지니어링 하이브리드 에너지 저장 시스템 YES-ESS

 

주요사양 및 시험결과

Item Criteria Measured Data Results
Visual Inspection w355 x d655 x h800 ±5mm - Passed
Output Voltage Regulation 100VAC ± 2% @0%, 50%, 100% Load 0.01% Passed
Output Frequency Regulation 60Hz ± 0.5% @0%, 50%, 100% Load -0.47% Passed
Efficiency min. 85% @ 100% Load 87.64% Passed
Input Current THD max. 85% @ 100% Load 4.37% Passed
Output Voltage THD max. 3% @ 0%,50%, 100% Load 1.64% Passed
Step Load Test Step Load : 50% -> 100%
- Transient Voltage : ±5%
- Recovery Time : within 50ms
-1.14%
3ms
Passed
Power Failure / Restore Test - Transient Voltage : ±5%
- Recovery Time : within 50ms
1.14%
6ms
Passed
Transfer Time Test Within 4ms 0.9ms Passed
Audible Noise 62dBA @ 1.5m distance 61dBA Passed
Battery Current Limitation 5.0A ± 1.0A 5.7A Passed
ESS Operation Mode Test Mode 1. Battery(Charge) Mode Rectifier + Battery Charge Passed
Mode 2. Commercial & PV Power Mode Rectifier + PV Charge Passed
Mode 3. PV & Battery(Discharge) Mode PV Charge + Battery Discharge Passed
Mode 4. Battery(Discharge) Mode Battery Discharge Passed
Mode 5. Commercial Power Failure Mode Battery Discharge + PV Power Passed

Inquiry

Komachine Inc.
Head Office:
Ace Dongbaek Tower 1-1101, 16-4,
Dongbaekjungang-ro 16beon-gil, Giheung-gu,
Yongin City, Gyeonggido, South Korea 17015
Branch Office:
606, Seoul Stratup Center, 10,
Noryangjin-ro, Dongjak-gu, Seoul, South Korea 06938
CEOCharlie Park
Corporate #535-86-00664

ⓒ2024 Komachine Inc. All rights reserved.